Pages that link to "Item:Q5444631"
From MaRDI portal
The following pages link to Least in-sequence probability heuristic for mixed-volume production lines (Q5444631):
Displaying 6 items.
- Level scheduling under limited resequencing flexibility (Q539476) (← links)
- Improvement of earliness and lateness by postponement on an automotive production line (Q930141) (← links)
- A correlation and heuristic approach for obtaining production sequences requiring a minimum of tool replacements (Q1869916) (← links)
- Robust car sequencing for automotive assembly (Q2030663) (← links)
- Modeling sequence scrambling and related phenomena in mixed-model production lines (Q2514823) (← links)
- In-Line Sequencing in Automotive Production Plants—A Simulation Study (Q4685807) (← links)