Pages that link to "Item:Q5477730"
From MaRDI portal
The following pages link to A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times (Q5477730):
Displaying 6 items.
- General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach (Q497626) (← links)
- A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times (Q552221) (← links)
- Computing lower and upper bounds for a large-scale industrial job shop scheduling problem (Q1011298) (← links)
- An enhanced TSP-based heuristic for makespan minimization in a flow shop with setup times (Q1806709) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- A Savings Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up Times (Q4896692) (← links)