Pages that link to "Item:Q5478837"
From MaRDI portal
The following pages link to Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach (Q5478837):
Displaying 21 items.
- Optimisation of integrated reverse logistics networks with different product recovery routes (Q296710) (← links)
- Reverse supply chains: effects of collection network and returns classification on profitability (Q319788) (← links)
- Periodic review policy for a two-echelon closed-loop inventory system with correlations between demands and returns (Q505202) (← links)
- Optimal production planning for a multi-product closed loop system with uncertain demand and return (Q609812) (← links)
- Integrated planning for design and production in two-stage recycling operations (Q1622807) (← links)
- Multi-objective fuzzy mathematical modelling of closed-loop supply chain considering economical and environmental factors (Q1699161) (← links)
- Integrated recycling-integrated production-distribution planning for decentralized closed-loop supply chain (Q1716962) (← links)
- Coordinating a three-stage closed-loop supply chain considering the effects of changes in the return rates and number of plants (Q1942861) (← links)
- Competition and integration in closed-loop supply chain network with variational inequality (Q1954867) (← links)
- Ordering and waste reuse decisions in a make-to-order system under demand uncertainty (Q2160521) (← links)
- Towards circular economy in production planning: challenges and opportunities (Q2189927) (← links)
- Optimal replenishment quantity for new products and return rate of used products for a retailer (Q2281724) (← links)
- A multi-stage stochastic integer programming approach for a multi-echelon lot-sizing problem with returns and lost sales (Q2289944) (← links)
- Optimal acquisition and inventory control for a remanufacturing system (Q2312182) (← links)
- On the effect of quality overestimation in remanufacturing (Q3163176) (← links)
- Parts-mix analysis in recycling-oriented manufacturing systems for multiple-item production (Q4496924) (← links)
- A Heuristic Approach for Integrating Product Recovery into Post PLC Spare Parts Procurement (Q5392022) (← links)
- Operational methods for minimization of energy consumption of manufacturing equipment (Q5444532) (← links)
- The use of recycled materials in manufacturing: implications for supply chain management and operations strategy (Q5444545) (← links)
- Integrated disassembly and reprocessing lot-sizing for multi-level structured products in remanufacturing systems (Q6048203) (← links)
- Supplier selection in closed loop pharma supply chain: a novel BWM-GAIA framework (Q6170595) (← links)