Pages that link to "Item:Q548013"
From MaRDI portal
The following pages link to Minimizing weighted mean absolute deviation of job completion times from their weighted mean (Q548013):
Displaying 5 items.
- Equivalence of mean flow time problems and mean absolute deviation problems (Q1173904) (← links)
- Identical parallel machine scheduling with assurance of maximum waiting time for an emergency job (Q2185530) (← links)
- Mean completion time for a randomly varying rate of work (Q3383681) (← links)
- Minimizing weighted mean absolute deviation of flow times in single machine systems (Q4255010) (← links)
- Minimizing mean absolute deviation of job completion times from the mean completion time (Q4526923) (← links)