The following pages link to (Q5482513):
Displaying 8 items.
- Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups (Q539458) (← links)
- The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times (Q706984) (← links)
- Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions (Q1303540) (← links)
- A capacitated lot sizing problem with stochastic setup times and overtime (Q1991273) (← links)
- A heuristic procedure for the capacitated lot sizing problem with setup carry-over (Q2725165) (← links)
- A Tabu-Search Heuristic for the Capacitated Lot-Sizing Problem with Set-up Carryover (Q3114705) (← links)
- A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over (Q5200785) (← links)
- Capacitated lot sizing with alternative routings and overtime decisions (Q5438625) (← links)