Pages that link to "Item:Q5505680"
From MaRDI portal
The following pages link to Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays (Q5505680):
Displaying 8 items.
- Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration (Q621032) (← links)
- Exact method for the two-machine flow-shop problem with time delays (Q829189) (← links)
- Minimizing total completion time in two-machine flow shops with exact delays (Q1000994) (← links)
- Improved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lag (Q2108105) (← links)
- Approximating the 2-machine flow shop problem with exact delays taking two values (Q2174271) (← links)
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard (Q2464428) (← links)
- Minimizing total completion time in a two-machine flowshop: Analysis of special cases (Q4645936) (← links)
- Minimizing the total weighted completion time in a two-machine proportionate flow shop with different machine speeds (Q5478829) (← links)