Pages that link to "Item:Q553937"
From MaRDI portal
The following pages link to An integrated cost model for production scheduling and perfect maintenance (Q553937):
Displaying 10 items.
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- Simultaneous scheduling of production and preventive maintenance on a single machine (Q1640459) (← links)
- Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures (Q1688445) (← links)
- Data-driven integrated production and maintenance optimization (Q2050244) (← links)
- Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem (Q2664314) (← links)
- Two-machine flow shop scheduling integrated with preventive maintenance planning (Q2795170) (← links)
- Integrated model of single-machine scheduling and maintenance decision for degrading state systems (Q2994160) (← links)
- Integrating production scheduling and preventive maintenance for a single machine with due window (Q3461443) (← links)
- An Integrated Cost Model for the Joint Optimization of Process Control and Maintenance (Q3796948) (← links)
- Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process (Q5438259) (← links)