Pages that link to "Item:Q5689648"
From MaRDI portal
The following pages link to Sequencing with setup time and order tardiness trade-offs (Q5689648):
Displaying 10 items.
- Tradeoff between setup times and carrying costs for finished items (Q690011) (← links)
- Customer order scheduling on a single machine with family setup times: complexity and algorithms (Q870129) (← links)
- Order selection on a single machine with high set-up costs (Q1309884) (← links)
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- Impact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-dates (Q1694928) (← links)
- Domino sequencing: scheduling with state-based sequence-dependent setup times (Q2294316) (← links)
- Sequencing with ordered criteria, precedence and group technology constraints (Q2731287) (← links)
- Bicriteria scheduling with vacations on a single machine (Q2997965) (← links)
- Sequencing heuristic for bicriteria scheduling in a single machine problem (Q3411893) (← links)
- Single machine scheduling to minimize the setup time and the earliness (Q3411902) (← links)