Pages that link to "Item:Q5708850"
From MaRDI portal
The following pages link to A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP (Q5708850):
Displaying 13 items.
- Flow shop non-idle scheduling and resource-constrained scheduling (Q271983) (← links)
- The two-machine flowshop total completion time problem: branch-and-bound algorithms based on network-flow formulation (Q322969) (← links)
- An assignment-based lower bound for a class of two-machine flow shop problems (Q336351) (← links)
- Improved lower bounds for minimizing the sum of completion times of n jobs over m machines in a flow shop (Q582206) (← links)
- Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration (Q621032) (← links)
- Lower bounds for minimizing total completion time in a two-machine flow shop (Q880570) (← links)
- The two-machine total completion time flow shop problem (Q1266536) (← links)
- Time complexity and linear-time approximation of the ancient two-machine flow shop (Q1268836) (← links)
- The two-machine flowshop total completion time problem: improved lower bounds and a branch-and-bound algorithm (Q1876196) (← links)
- The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies (Q2356207) (← links)
- Polynomial lower bounds for the two-machine flowshop problem with sequence-independent setup times (Q2861538) (← links)
- Minimizing Total Idle Energy Consumption in the Permutation Flow Shop Scheduling Problem (Q4561176) (← links)
- Minimizing total completion time in a two-machine flowshop: Analysis of special cases (Q4645936) (← links)