Pages that link to "Item:Q5713893"
From MaRDI portal
The following pages link to Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems (Q5713893):
Displaying 14 items.
- Solving job shop scheduling with setup times through constraint-based iterative sampling: an experimental analysis (Q421447) (← links)
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis (Q817121) (← links)
- Models for global constraint applications (Q879975) (← links)
- A branch and bound method for the job-shop problem with sequence-dependent setup times (Q940884) (← links)
- Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times (Q964844) (← links)
- Solving the flexible job shop scheduling problem with sequence-dependent setup times (Q1681272) (← links)
- A worker constrained flexible job shop scheduling problem with sequence-dependent setup times (Q1733093) (← links)
- A branch \(\&\) bound method for the general-shop problem with sequence dependent setup-times (Q1919357) (← links)
- An exact approach to the generalized serial-lock scheduling problem from a flexible job-shop scheduling perspective (Q2027031) (← links)
- An efficient filtering algorithm for the unary resource constraint with transition times and optional activities (Q2197325) (← links)
- Corrigendum to: ``Solving the flexible job shop scheduling problem with sequence-dependent setup times'' (Q2242323) (← links)
- Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (Q2378452) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- An advanced scatter search algorithm for solving job shops with sequence dependent and non-anticipatory setups (Q4589091) (← links)