Pages that link to "Item:Q5936454"
From MaRDI portal
The following pages link to Scheduling with unexpected machine breakdowns (Q5936454):
Displaying 15 items.
- Semi-online scheduling on a single machine with unexpected breakdown (Q306274) (← links)
- Minimizing total weighted completion time with an unexpected machine unavailable interval (Q398911) (← links)
- Static worksharing strategies for heterogeneous computers with unrecoverable interruptions (Q645850) (← links)
- Online scheduling on semi-related machines (Q963475) (← links)
- Assessing the effects of machine breakdowns in stochastic scheduling (Q1116880) (← links)
- Speed-robust scheduling. Sand, bricks, and rocks (Q2061889) (← links)
- An improved semi-online algorithm for scheduling on a single machine with unexpected breakdown (Q2185825) (← links)
- Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures (Q2305019) (← links)
- Modeling of a scheduling problem with expected availability of resources (Q2359236) (← links)
- Speed-robust scheduling: sand, bricks, and rocks (Q2689830) (← links)
- Multiprocessor Jobs, Preemptive Schedules, and One-Competitive Online Algorithms (Q3453298) (← links)
- A Survey on Approximation Algorithms for Scheduling with Machine Unavailability (Q3637311) (← links)
- Uncertain flexible flow shop scheduling problem subject to breakdowns (Q5275883) (← links)
- Multiprocessor jobs, preemptive schedules, and one-competitive online algorithms (Q6556180) (← links)
- Scheduling with speed predictions (Q6574930) (← links)