Pages that link to "Item:Q5945489"
From MaRDI portal
The following pages link to Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions (Q5945489):
Displaying 10 items.
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Mathematical programming and financial objectives for scheduling projects (Q880522) (← links)
- Order-based neighborhoods for project scheduling with nonregular objective functions. (Q1399577) (← links)
- New model and heuristics for safety stock placement in general acyclic supply chain networks (Q1762120) (← links)
- Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications (Q1854657) (← links)
- Design and operation for an electric taxi fleet (Q2260896) (← links)
- A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry (Q3055358) (← links)
- A bidirectional heuristic for maximizing the net present value of large-scale projects subject to limited resources (Q4456063) (← links)
- Scheduling the production of rolling ingots: industrial context, model, and solution method (Q4814095) (← links)