Pages that link to "Item:Q5951737"
From MaRDI portal
The following pages link to Critical path analysis in the network with fuzzy activity times (Q5951737):
Displaying 34 items.
- A fuzzy time-dependent project scheduling problem (Q497277) (← links)
- Solution of interval PERT/CPM network problems by a simplified tabular method (Q505096) (← links)
- A heuristic method for RCPSP with fuzzy activity times (Q621664) (← links)
- A path enumeration approach for the analysis of critical activities in fuzzy networks (Q713412) (← links)
- On combinatorial optimization problems on matroids with uncertain weights (Q856278) (← links)
- Applying fuzzy method for measuring criticality in project network (Q881877) (← links)
- On the latest starting times and criticality of activities in a network with imprecise durations (Q988966) (← links)
- A minmax regret approach to the critical path method with task interval times (Q1011286) (← links)
- The minimum spanning tree problem with fuzzy costs (Q1028710) (← links)
- A simple approach to fuzzy critical path analysis in project networks (Q1031604) (← links)
- Computing latest starting times of activities in interval-valued networks with minimal time lags (Q1044116) (← links)
- Fuzzy shortest path problems incorporating interactivity among paths. (Q1426738) (← links)
- Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters. (Q1426739) (← links)
- Modeling and simulation of project management through the PMBOK\(^{\circledR}\) standard using complex networks (Q1694207) (← links)
- A new approach to determine the critical path in stochastic activity network (Q1718645) (← links)
- Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selection (Q1730473) (← links)
- On computing the latest starting times and floats of activities in a network with imprecise durations (Q1770714) (← links)
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge (Q1869705) (← links)
- Fuzzy temporal characteristics of operations for project management on the network models basis (Q1869708) (← links)
- On latest starting times and floats in activity networks with ill-known durations (Q1869710) (← links)
- On the hardness of evaluating criticality of activities in a planar network with duration intervals (Q1870004) (← links)
- Using stochastic decision networks to assess costs and completion times of refurbishment work in construction (Q2335078) (← links)
- Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks (Q2336948) (← links)
- Using metric distance ranking method to find intuitionistic fuzzy critical path (Q2336968) (← links)
- Analysis of critical paths in a project network with fuzzy activity times (Q2370365) (← links)
- Project management decisions using fuzzy linear programming (Q3437470) (← links)
- (Q3991143) (← links)
- (Q3991144) (← links)
- A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network (Q5216837) (← links)
- Fuzzy critical path method based on ranking methods using hexagonal fuzzy numbers for decision making (Q5275877) (← links)
- Fuzzy critical path for project network (Q5692973) (← links)
- The computational complexity of the criticality problems in a network with interval activity times (Q5953342) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)
- Project management using network analysis in fuzzy environment (Q6608593) (← links)