Pages that link to "Item:Q5955973"
From MaRDI portal
The following pages link to A high-performance exact method for the resource-constrained project scheduling problem (Q5955973):
Displaying 12 items.
- Tri-directional scheduling scheme: theory and computation (Q655202) (← links)
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search (Q702729) (← links)
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements (Q924628) (← links)
- An exact composite lower bound strategy for the resource-constrained project scheduling problem (Q1652587) (← links)
- A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints (Q2029253) (← links)
- The resource constrained project scheduling problem with multiple crashable modes: An exact solution method (Q2726429) (← links)
- (Q3044286) (← links)
- Um algoritmo exato para o problema de programação de projetos com custo de disponibilidade de recursos e múltiplos modos (Q3625796) (← links)
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem (Q5948200) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)