Pages that link to "Item:Q5966559"
From MaRDI portal
The following pages link to Optimal Assignment of Total-work-content Due-dates and Sequencing in a Single-machine Shop (Q5966559):
Displaying 15 items.
- Optimal assignment of slack due-date and sequencing in a single machine shop (Q803030) (← links)
- A note on a proof of SPT optimality for single-machine sequencing problems via the transportation problem (Q909576) (← links)
- Optimal due-date assignment and sequencing in a single machine shop (Q917427) (← links)
- Optimal assignment of slack due-dates and sequencing in a single-machine shop (Q917429) (← links)
- The Browne-Yechiali single-machine sequence is optimal for flow-shops (Q976013) (← links)
- Optimal total-work-content-power due-date determination and sequencing (Q1097161) (← links)
- On a single-machine optimal constant due-date assignment and sequencing problem (Q1110452) (← links)
- Optimal due-date assignment and sequencing (Q1197665) (← links)
- Optimal assignment of due-dates for preemptive single-machine scheduling (Q1341396) (← links)
- Lot-order assignment applying priority rules for the single-machine total tardiness scheduling with nonnegative time-dependent processing times (Q1665667) (← links)
- Job sequencing and due date assignment in a single machine shop with uncertain processing times (Q2383106) (← links)
- Minimizing flowtime and missed due-dates in single-machine sequencing (Q2640435) (← links)
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single Machine (Q3315256) (← links)
- Optimal due-date assignment for a single machine sequencing problem with random processing times (Q3737189) (← links)
- A Single Machine Model for Determination of Optimal Due Dates and Sequence (Q4017090) (← links)