Pages that link to "Item:Q6048213"
From MaRDI portal
The following pages link to A novel heuristic method for the energy-efficient flexible job-shop scheduling problem with sequence-dependent set-up and transportation time (Q6048213):
Displaying 12 items.
- Multi-objective bi-level programming for the energy-aware integration of flexible job shop scheduling and multi-row layout (Q1712074) (← links)
- A new energy-aware flexible job shop scheduling method using modified biogeography-based optimization (Q1993083) (← links)
- A bi-objective heuristic approach for green identical parallel machine scheduling (Q2029023) (← links)
- A study on PGEP to evolve heuristic rules for FJSSP considering the total cost of energy consumption and weighted tardiness (Q2327435) (← links)
- A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: trade-off between production costs and energy consumption (Q2656739) (← links)
- Integrated scheduling of machines and AGVs in green job shop (Q3386015) (← links)
- Advances in green shop scheduling and optimization (Q4687964) (← links)
- (Q5383440) (← links)
- Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints (Q6109801) (← links)
- Fuzzy cleaner production in assembly flexible job-shop scheduling with machine breakdown and batch transportation: Lagrangian relaxation (Q6110962) (← links)
- Simulated-annealing-based hyper-heuristic for flexible job-shop scheduling (Q6191890) (← links)
- Unrelated parallel machine energy-efficient scheduling considering sequence-dependent setup times and time-of-use electricity tariffs (Q6491320) (← links)