Pages that link to "Item:Q6077487"
From MaRDI portal
The following pages link to Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work (Q6077487):
Displaying 5 items.
- Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works (Q2083387) (← links)
- Scheduling a single machine with primary and secondary objectives (Q2331605) (← links)
- Pareto optima for total weighted completion time and maximum lateness on a single machine (Q2457015) (← links)
- Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work (Q6057022) (← links)
- Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work (Q6076476) (← links)