Pages that link to "Item:Q610076"
From MaRDI portal
The following pages link to The effect of service constraint on EPQ model with random defective rate (Q610076):
Displaying 8 items.
- The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra (Q554723) (← links)
- The effect of service level constraint on EPQ model with random defective rate (Q610049) (← links)
- A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns'' (Q1037696) (← links)
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering (Q1708531) (← links)
- Note on ``Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint'' (Q2001793) (← links)
- Solving an EPQ model with rework and service level constraint (Q2455815) (← links)
- A simple method to investigate the effect of service constraint on EPQ model (Q3013196) (← links)
- The EPQ model with random defective rate under service constraint without calculus (Q3643075) (← links)