Pages that link to "Item:Q6109310"
From MaRDI portal
The following pages link to A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310):
Displaying 4 items.
- A tree search heuristic for the resource constrained project scheduling problem with transfer times (Q2079399) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)
- An adapted constraint-programming formulation of the resource-constrained project scheduling problem applied to the identical parallel machines group shop and mixed shop scheduling problems (Q6659821) (← links)