Pages that link to "Item:Q6164385"
From MaRDI portal
The following pages link to Tabu search for proactive project scheduling problem with flexible resources (Q6164385):
Displaying 4 items.
- Project scheduling cost optimization based on resource transfer costs and robustness (Q6065647) (← links)
- A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff (Q6146634) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)