Pages that link to "Item:Q6173710"
From MaRDI portal
The following pages link to On the complexity of open shop scheduling with time lags (Q6173710):
Displaying 10 items.
- Complexity results for flow-shop and open-shop scheduling problems with transportation delays (Q596453) (← links)
- Open shops with jobs overlap -- revisited (Q706904) (← links)
- A note on the complexity of the concurrent open shop problem (Q880556) (← links)
- On complexity of minimizing weighted number of late jobs in unit time open shops (Q1356519) (← links)
- Time buffers in the open shop problem (Q2786901) (← links)
- (Q3801319) (← links)
- Open shop scheduling with delays (Q4020512) (← links)
- (Q4822050) (← links)
- NP-hardness of compact scheduling in simplified open and flow shops. (Q5932026) (← links)
- Scheduling in manufacturing with transportation: classification and solution techniques (Q6586212) (← links)