Pages that link to "Item:Q631092"
From MaRDI portal
The following pages link to The stochastic economic lot scheduling problem: a survey (Q631092):
Displaying 26 items.
- Agile factorial production for a single manufacturing line with multiple products (Q319672) (← links)
- Quasi-fixed cyclic production schemes for multiple products with stochastic demand (Q322851) (← links)
- Linear programming models for a stochastic dynamic capacitated lot sizing problem (Q337545) (← links)
- The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers (Q383160) (← links)
- Economic lot scheduling with deliberated and controlled coproduction (Q439695) (← links)
- Polling systems with batch service (Q443826) (← links)
- Admission policies for the customized stochastic lot scheduling problem with strict due-dates (Q545109) (← links)
- On the economic lot scheduling problem with backlogging: The common cycle approach (Q1200773) (← links)
- A computational study of the general lot-sizing and scheduling model under demand uncertainty via robust and stochastic approaches (Q1652514) (← links)
- Flexible lot sizing in hybrid make-to-order/make-to-stock production planning (Q1753524) (← links)
- A clearing function based bid-price approach to integrated order acceptance and release decisions (Q1754318) (← links)
- The economic lot scheduling problem without capacity constraints (Q1772974) (← links)
- The economic lot scheduling problem -- survey and LP-based method (Q1808726) (← links)
- Dynamic capacitated lot sizing with random demand and dynamic safety stocks (Q1936589) (← links)
- Asymptotic optimality of the binomial-exhaustive policy for polling systems with large switchover times (Q2108909) (← links)
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach (Q2356184) (← links)
- A profit-maximizing economic lot scheduling problem with price optimization (Q2384842) (← links)
- The analysis of batch sojourn-times in polling systems (Q2397976) (← links)
- On polling systems with large setups (Q2465945) (← links)
- Integrated condition-based maintenance and multi-item lot-sizing with stochastic demand (Q2698605) (← links)
- The Impact of Adding a Make-to-Order Item to a Make-to-Stock Production System (Q3116679) (← links)
- Scheduling and order acceptance for the customised stochastic lot scheduling problem (Q3163275) (← links)
- (Q3436597) (← links)
- The Stochastic Economic Lot Scheduling Problem: Cyclical Base-Stock Policies with Idle Times (Q4363638) (← links)
- The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies (Q4897086) (← links)
- The Economic Lot and Supply Scheduling Problem Under a Power-of-Two Policy (Q5392023) (← links)