Pages that link to "Item:Q632677"
From MaRDI portal
The following pages link to A heuristic approach for resource constrained project scheduling with uncertain activity durations (Q632677):
Displaying 23 items.
- A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations (Q309061) (← links)
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Genetic tabu search for the fuzzy flexible job shop problem (Q337343) (← links)
- A heuristic method for RCPSP with fuzzy activity times (Q621664) (← links)
- Time slack-based techniques for robust project scheduling subject to resource uncertainty (Q646671) (← links)
- When it is worthwhile to work with the stochastic RCPSP? (Q835549) (← links)
- A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept (Q852940) (← links)
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations (Q906557) (← links)
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations (Q991368) (← links)
- Resource constrained scheduling simulation model for alternative stochastic network projects. (Q1399956) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- A computational study of exact approaches for the adjustable robust resource-constrained project scheduling problem (Q1654362) (← links)
- Operating room surgery scheduling with fuzzy surgery durations using a metaheuristic approach (Q1738980) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Optimizing resource-constrained project scheduling problem considering the reliability function (Q2163632) (← links)
- Proactive policies for the stochastic resource-constrained project scheduling problem (Q2275822) (← links)
- Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (Q2356119) (← links)
- An evolutionary approach for resource constrained project scheduling with uncertain changes (Q2664456) (← links)
- A compact reformulation of the two-stage robust resource-constrained project scheduling problem (Q2668660) (← links)
- A RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH REATTEMPT AT FAILURE : A HEURISTIC APPROACH (Q4367070) (← links)
- (Q4494016) (← links)
- Resource Constrained Scheduling within Fixed Project Durations (Q5289362) (← links)
- Shortening the project schedule: solving multimode chance-constrained critical chain buffer management using reinforcement learning (Q6581386) (← links)