Pages that link to "Item:Q640307"
From MaRDI portal
The following pages link to Parametric algorithms for 2-cyclic robot scheduling with interval processing times (Q640307):
Displaying 7 items.
- Optimal \(K\)-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times (Q282247) (← links)
- A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times (Q617517) (← links)
- A faster polynomial algorithm for 2-cyclic robotic scheduling (Q880563) (← links)
- A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case (Q1003678) (← links)
- A note on a quadratic algorithm for the 2-cyclic robotic scheduling problem (Q1034640) (← links)
- Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints (Q2467264) (← links)
- Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint (Q6133185) (← links)