Pages that link to "Item:Q6485416"
From MaRDI portal
The following pages link to Solving Job-Shop Scheduling Problems with Fuzzy Processing Times and Fuzzy Due Dates (Q6485416):
Displaying 13 items.
- Fuzzy job-shop scheduling problems: a review (Q506738) (← links)
- Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates (Q697023) (← links)
- A fuzzy dispatching strategy for due-date scheduling of FMSs with information delays (Q988773) (← links)
- Two scheduling problems with fuzzy due-dates (Q1198861) (← links)
- Real-time task scheduling with fuzzy deadlines and processing times (Q1595194) (← links)
- Survey on fuzzy shop scheduling (Q1794871) (← links)
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms (Q1969842) (← links)
- On a flow-shop scheduling problem with fuzzy pentagonal processing time (Q2036064) (← links)
- Solving constrained flow-shop scheduling problem through multistage fuzzy binding approach with fuzzy due dates (Q2092700) (← links)
- Evolutionary tabu search for flexible due-date satisfaction in fuzzy job shop scheduling (Q2177824) (← links)
- Research on the practical production scheduling decision based on fuzzy synthetic evaluation (Q2927308) (← links)
- Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: a fuzzy-neural approach (Q5387379) (← links)
- Advances in Neural Networks – ISNN 2005 (Q5706991) (← links)