Pages that link to "Item:Q670765"
From MaRDI portal
The following pages link to Lockage scheduling of three gorges-gezhouba dams by hybrid of chaotic particle swarm optimization and heuristic-adjusted strategies (Q670765):
Displaying 5 items.
- Short-term cascaded hydroelectric system scheduling based on chaotic particle swarm optimization using improved logistic map (Q375632) (← links)
- Series queuing network scheduling approach to co-scheduling model of three Gorges-Gezhou dam (Q625670) (← links)
- Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project (Q950037) (← links)
- Exact and heuristic methods for optimizing lock-quay system in inland waterway (Q1737520) (← links)
- Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA‐II (Q6090473) (← links)