Pages that link to "Item:Q707768"
From MaRDI portal
The following pages link to Solving job shop scheduling problems utilizing the properties of backbone and ``big valley'' (Q707768):
Displaying 8 items.
- A tabu search/path relinking algorithm to solve the job shop scheduling problem (Q337272) (← links)
- An optimal online algorithm for two-machine open shop preemptive scheduling with bounded processing times (Q968014) (← links)
- Coordination of production and transportation in supply chain scheduling (Q2514664) (← links)
- Preemptive scheduling in a two-stage supply chain to minimize the makespan (Q3458814) (← links)
- A new hybrid parallel genetic algorithm for the job‐shop scheduling problem (Q4980005) (← links)
- Combining prospect theory with fuzzy theory to handle disruption in production scheduling (Q5024608) (← links)
- An extended Akers graphical method with a biased random‐key genetic algorithm for job‐shop scheduling (Q5416771) (← links)
- An intensification approach based on fitness landscape characteristics for job shop scheduling problem (Q6645165) (← links)