Pages that link to "Item:Q724006"
From MaRDI portal
The following pages link to Maximising the weighted number of activity execution modes in project planning (Q724006):
Displaying 3 items.
- Consistency checking of STNs with decisions: managing temporal and access-control constraints in a seamless way (Q821554) (← links)
- Multimode resource-constrained project scheduling in flexible projects (Q2301187) (← links)
- Polyhedral Results and Branch-and-Cut for the Resource Loading Problem (Q4995060) (← links)