Pages that link to "Item:Q724063"
From MaRDI portal
The following pages link to Optimal and heuristic policies for assemble-to-order systems with different review periods (Q724063):
Displaying 11 items.
- An independent inventory control heuristic for multi-component assemble-to-order systems (Q969389) (← links)
- An order expediting policy for continuous review systems with manufacturing lead-time (Q1046131) (← links)
- Assemble-to-order systems: a review (Q1753635) (← links)
- Component allocation in make-to-stock assembly systems (Q2033404) (← links)
- On inventory allocation for periodic review assemble-to-order systems (Q2297661) (← links)
- Note on ``Heuristics with guaranteed performance bounds for a manufacturing system with product recovery'' (Q2629699) (← links)
- Managing an assemble-to-order system with after sales market for components (Q2630229) (← links)
- Comparison and evaluation of lot-to-order matching policies for a semiconductor assembly and test facility (Q4497252) (← links)
- Optimal and asymptotically optimal policies for assemble-to-order n- and W-systems (Q4632867) (← links)
- Order-Based Cost Optimization in Assemble-to-Order Systems (Q5322079) (← links)
- Synchronization in a two‐supplier assembly system: Combining a fixed lead‐time module with capacitated m<scp>ake‐to‐order</scp> production (Q6077483) (← links)