Pages that link to "Item:Q724091"
From MaRDI portal
The following pages link to A multi-objective integrated model for selecting, scheduling, and budgeting road construction projects (Q724091):
Displaying 5 items.
- Integration of selecting and scheduling urban road construction projects as a time-dependent discrete network design problem (Q319862) (← links)
- A nonlinear multiobjective bilevel model for minimum cost network flow problem in a large-scale construction project (Q1954798) (← links)
- Optimizing the selection and scheduling of multi-class projects using a Stackelberg framework (Q2184142) (← links)
- (Q3575820) (← links)
- Logic-based benders decomposition for bi-objective parallel machine selection and job scheduling with release dates and resource consumption (Q6551137) (← links)