Pages that link to "Item:Q724093"
From MaRDI portal
The following pages link to Yard crane scheduling for container storage, retrieval, and relocation (Q724093):
Displaying 17 items.
- Solving the container relocation problem by an improved greedy look-ahead heuristic (Q300075) (← links)
- Positioning of loading units in a transshipment yard storage area (Q1944878) (← links)
- High multiplicity asymmetric traveling salesman problem with feedback vertex set and its application to storage/retrieval system (Q2029029) (← links)
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area (Q2124909) (← links)
- Smart stacking for import containers using customer information at automated container terminals (Q2140194) (← links)
- Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals (Q2147157) (← links)
- Pilotage planning in seaports (Q2189919) (← links)
- The block relocation problem with appointment scheduling (Q2242274) (← links)
- An exact method for scheduling a yard crane (Q2256284) (← links)
- A branch and bound approach for large pre-marshalling problems (Q2424778) (← links)
- Pre-processing a container yard under limited available time (Q2664376) (← links)
- (Q2983820) (← links)
- Scheduling optimization of yard crane for import containers based on truck batch arrival pattern (Q2983829) (← links)
- (Q3175457) (← links)
- Carbon-efficient scheduling problem of electric rubber-tyred gantry cranes in a container terminal (Q6094578) (← links)
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions (Q6113444) (← links)
- Models and algorithms for a yard crane scheduling problem in container ports (Q6167632) (← links)