Pages that link to "Item:Q744638"
From MaRDI portal
The following pages link to Approximability results for the resource-constrained project scheduling problem with a single type of resources (Q744638):
Displaying 5 items.
- Approximability of scheduling problems with resource consuming jobs (Q256641) (← links)
- Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources (Q513559) (← links)
- On a paper by Christofides et al. for solving the multiple-resource constrained, single project scheduling problem (Q1331569) (← links)
- On lower and upper bounds for single machine parallel batch scheduling (Q2091210) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)