Pages that link to "Item:Q744646"
From MaRDI portal
The following pages link to Batch sizing and just-in-time scheduling with common due date (Q744646):
Displaying 10 items.
- Batching scheduling in a two-level supply chain with earliness and tardiness penalties (Q328087) (← links)
- Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence (Q490158) (← links)
- Batch-scheduling problems to minimize actual flow times of parts through the shop under JIT environment (Q1328578) (← links)
- Hybrid approach for a single-batch-processing machine scheduling problem with a just-in-time objective and consideration of non-identical due dates of jobs (Q2027084) (← links)
- A bi-criteria optimization model for medical device sterilization (Q2212292) (← links)
- The multi-stage multi-product batch-sizing problem in the steel industry (Q2287574) (← links)
- Just-in-time single-batch-processing machine scheduling (Q2669787) (← links)
- Single machine batch just-in-time scheduling problems with common batch size and common due date of jobs (Q2924306) (← links)
- A Bicriterion Approach to Due Date Assignment Scheduling in Single-Machine with Position-Dependent Weights (Q6053517) (← links)
- Optimization with uncertainties: a scheduling example (Q6090379) (← links)