Pages that link to "Item:Q747027"
From MaRDI portal
The following pages link to Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty (Q747027):
Displaying 7 items.
- Bi-objective multi-mode project scheduling under risk aversion (Q319785) (← links)
- A nonlinear multiobjective bilevel model for minimum cost network flow problem in a large-scale construction project (Q1954798) (← links)
- Integrated scheduling and batch ordering for construction project (Q1991384) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Simulated annealing and genetic algorithm based method for a bi-level \textit{seru} loading problem with worker assignment in \textit{seru} production systems (Q2031373) (← links)
- A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282) (← links)
- Multi-mode resource constrained project scheduling problem along with contractor selection (Q5889173) (← links)