The following pages link to EOR project networks (Q760101):
Displaying 2 items.
- Algorithms for single-machine scheduling with stochastic outtree precedence relations to minimize expected weighted flow time or maximum expected lateness (Q4300605) (← links)
- Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process (Q6588495) (← links)