Pages that link to "Item:Q766253"
From MaRDI portal
The following pages link to Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound (Q766253):
Displaying 10 items.
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities (Q280170) (← links)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- A Lagrangian relaxation approach to the mixed-product assembly line sequencing problem: a case study of a door-lock company in Taiwan (Q1632965) (← links)
- Minimizing the completion time of a project under resource constraints and feeding precedence relations: an exact algorithm (Q1935550) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Benders decomposition for a period-aggregated resource leveling problem with variable job duration (Q2668707) (← links)
- Lagrangian relaxation-based lower bound for resource-constrained modulo scheduling (Q2883566) (← links)
- An iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problem (Q6066724) (← links)
- Preprocessing the discrete time-cost tradeoff problem with generalized precedence relations (Q6534414) (← links)
- Scheduling activities in project network with feeding precedence relations: an earliest start forward recursion algorithm (Q6588475) (← links)