Pages that link to "Item:Q835563"
From MaRDI portal
The following pages link to Single-machine scheduling with trade-off between number of tardy jobs and compression cost (Q835563):
Displaying 8 items.
- A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs (Q319449) (← links)
- Minimizing total tardiness on a single machine with controllable processing times (Q1000969) (← links)
- Single-machine scheduling with trade-off between number of tardy jobs and resource allocation (Q1362988) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- Scheduling two projects with controllable processing times in a single-machine environment (Q2215194) (← links)
- Scheduling to tradeoff between the number and the length of accepted jobs (Q2235744) (← links)
- A survey of scheduling with controllable processing times (Q2381529) (← links)
- Single-machine scheduling of multiple projects with controllable processing times (Q6167669) (← links)