Pages that link to "Item:Q852940"
From MaRDI portal
The following pages link to A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept (Q852940):
Displaying 8 items.
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- A heuristic approach for resource constrained project scheduling with uncertain activity durations (Q632677) (← links)
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment (Q744657) (← links)
- Structured construction and simulation of nondeterministic stochastic activity networks (Q1027622) (← links)
- Resource constrained scheduling simulation model for alternative stochastic network projects. (Q1399956) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- Critical chain project schedule management based on Bayesian network model (Q2993410) (← links)
- The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework (Q5223040) (← links)