Pages that link to "Item:Q869149"
From MaRDI portal
The following pages link to A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness (Q869149):
Displaying 19 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times (Q339586) (← links)
- Patient scheduling with periodic deteriorating maintenance on single medical device (Q342021) (← links)
- A beam search heuristic for scheduling a single machine with release dates and sequence dependent setup times to minimize the makespan (Q342431) (← links)
- Iterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness (Q398925) (← links)
- A GRASP based on DE to solve single machine scheduling problem with SDST (Q434179) (← links)
- ILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardiness (Q670296) (← links)
- A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness (Q864814) (← links)
- A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem (Q1302719) (← links)
- Efficient local search limitation strategy for single machine total weighted tardiness scheduling with sequence-dependent setup times (Q1652166) (← links)
- A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time (Q1885972) (← links)
- A BB\&R algorithm for minimizing total tardiness on a single machine with sequence dependent setup times (Q1928272) (← links)
- Single-machine scheduling to minimize maximum tardiness with minimum number of tardy jobs (Q1960313) (← links)
- Solving the single crane scheduling problem at rail transshipment yards (Q2422744) (← links)
- A branch and bound algorithm to minimize the single machine maximum tardiness problem under effects of learning and deterioration with setup times (Q2798129) (← links)
- Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times (Q4363689) (← links)
- Single Machine Scheduling with Major and Minor Setup Times: A Tabu Search Approach (Q4717156) (← links)
- Minimizing sum of completion times on a single machine with sequence-dependent family setup times (Q5469663) (← links)
- An exact branch-and-bound algorithm for \textit{seru} scheduling problem with sequence-dependent setup time and release date (Q6149341) (← links)