Pages that link to "Item:Q869182"
From MaRDI portal
The following pages link to A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms (Q869182):
Displaying 9 items.
- A spectral Rayleigh-Ritz scheme for nonlinear partial differential systems of first order (Q301267) (← links)
- Part sojourn time distribution in a two-machine line (Q320643) (← links)
- Modelling complex assemblies as a queueing network for lead time control (Q858340) (← links)
- Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm (Q960404) (← links)
- The risk element transmission theory research of multi-objective risk-time-cost trade-off (Q971715) (← links)
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times (Q975990) (← links)
- A multi-objective lead time control problem in multistage assembly systems using an interactive method (Q2495993) (← links)
- A change point control chart for monitoring the production lead time based on sum of squared ranks (Q5055122) (← links)
- Due-date assignment for multi-server multi-stage assembly systems (Q5252913) (← links)