Pages that link to "Item:Q875406"
From MaRDI portal
The following pages link to On a stochastic sequencing and scheduling problem (Q875406):
Displaying 21 items.
- Fix-and-relax-coordination for a multi-period location-allocation problem under uncertainty (Q336654) (← links)
- Integrated production scheduling and maintenance policy for robustness in a single machine (Q337021) (← links)
- On air traffic flow management with rerouting. II: Stochastic case (Q439637) (← links)
- Minimizing value-at-risk in single-machine scheduling (Q513548) (← links)
- On a fix-and-relax framework for a class of project scheduling problems (Q817205) (← links)
- On a mixture of the fix-and-relax coordination and Lagrangian substitution schemes for multistage stochastic mixed integer programming (Q839882) (← links)
- BFC-MSMIP: an exact branch-and-fix coordination approach for solving multistage stochastic mixed 0-1 problems (Q839891) (← links)
- On SIP algorithms for minimizing the mean-risk function in the multi-period single-source problem under uncertainty (Q1026569) (← links)
- On \(BFC-MSMIP\) strategies for scenario cluster partitioning, and twin node family branching selection and bounding for multistage stochastic mixed integer programming (Q1040974) (← links)
- Modeling methods and a branch and cut algorithm for pharmaceutical clinical trial planning using stochastic programming (Q1043350) (← links)
- BFC, A branch-and-fix coordination algorithmic framework for solving some types of stochastic pure and mixed 0--1 programs. (Q1410308) (← links)
- A branch-and-cluster coordination scheme for selecting prison facility sites under uncertainty (Q1761157) (← links)
- Rollout algorithms for stochastic scheduling problems (Q1806711) (← links)
- Scheduling In the random-order model (Q1979454) (← links)
- Risk-averse two-stage stochastic programs in furniture plants (Q2454333) (← links)
- Stochastic cyclic scheduling problem in synchronous assembly and production lines (Q3157792) (← links)
- (Q4343719) (← links)
- Stochastic sequencing with job families, set-up times, and due dates (Q4546853) (← links)
- THE SEQUENTIAL STOCHASTIC ASSIGNMENT PROBLEM WITH POSTPONEMENT OPTIONS (Q4929135) (← links)
- Cross-dock facility for disaster relief operations (Q6099460) (← links)
- Convex approximations of two-stage risk-averse mixed-integer recourse models (Q6498415) (← links)