Pages that link to "Item:Q875429"
From MaRDI portal
The following pages link to An exact method for \(Pm/sds, r_{i}/ \sum^{n}_{i=1} C_{i}\) problem (Q875429):
Displaying 7 items.
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates (Q614053) (← links)
- Parallel machine scheduling with precedence constraints and setup times (Q991370) (← links)
- Minimizing total completion time subject to release dates and sequence-dependent processing times (Q1290157) (← links)
- Total completion time minimization for machine scheduling problem under time windows constraints with jobs' linear processing rate function (Q1652513) (← links)
- A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times (Q2285809) (← links)
- MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints (Q2421327) (← links)
- A Multiobjective Optimization Approach to Solve a Parallel Machines Scheduling Problem (Q3083901) (← links)