Pages that link to "Item:Q877611"
From MaRDI portal
The following pages link to A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation (Q877611):
Displaying 4 items.
- Warmstarting for interior point methods applied to the long-term power planning problem (Q1011271) (← links)
- Medium-term power planning in electricity markets with pool and bilateral contracts (Q1753453) (← links)
- Heuristic solutions to the long-term unit commitment problem with cogeneration plants (Q1761973) (← links)
- Solving the electricity production planning problem by a column generation based heuristic (Q2434329) (← links)