Pages that link to "Item:Q884075"
From MaRDI portal
The following pages link to A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex (Q884075):
Displaying 11 items.
- Models for scheduling charges in continuous casting: application to a Brazilian steel plant (Q276311) (← links)
- A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process (Q319506) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- A GRASP heuristic for slab scheduling at continuous casters (Q480761) (← links)
- A hybrid particle swarm optimization and tabu search algorithm for order planning problems of steel factories based on the make-to-stock and make-to-order management architecture (Q542568) (← links)
- A mathematical programming model for scheduling steelmaking-continuous casting production (Q1969846) (← links)
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach (Q2356184) (← links)
- A combination of Lagrangian relaxation and column generation for order batching in steelmaking and continuous-casting production (Q3005835) (← links)
- (Q3081950) (← links)
- (Q3193850) (← links)
- Raw material inventory solution in iron and steel industry using Lagrangian relaxation (Q3505938) (← links)