Pages that link to "Item:Q884644"
From MaRDI portal
The following pages link to Using artificial bees to solve partitioning and scheduling problems in codesign (Q884644):
Displaying 5 items.
- An investigation on a two-agent single-machine scheduling problem with unequal release dates (Q339650) (← links)
- A branch-and-bound algorithm for a single machine sequencing to minimize the total tardiness with arbitrary release dates and position-dependent learning effects (Q497951) (← links)
- A honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready times (Q2009966) (← links)
- Bi-objective task assignment in heterogeneous distributed systems using honeybee mating optimization (Q2017928) (← links)
- The single-machine total tardiness problem with unequal release times and a linear deterioration (Q2511712) (← links)