Pages that link to "Item:Q887202"
From MaRDI portal
The following pages link to A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines (Q887202):
Displaying 13 items.
- Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty (Q323260) (← links)
- The new Fundamental Tree Algorithm for production scheduling of open pit mines (Q856303) (← links)
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity (Q958440) (← links)
- A hybrid heuristic algorithm for the open-pit-mining operational planning problem (Q992718) (← links)
- A dynamic-material-value-based decomposition method for optimizing a mineral value chain with uncertainty (Q1751684) (← links)
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty (Q1926975) (← links)
- A matheuristic for the 0--1 generalized quadratic multiple knapsack problem (Q2070116) (← links)
- A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problem (Q2160495) (← links)
- Hyper-heuristic approaches for strategic mine planning under uncertainty (Q2289889) (← links)
- Evolutionary approach for large-scale mine scheduling (Q2663534) (← links)
- Constructing branching trees of geostatistical simulations (Q2676486) (← links)
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm (Q5058828) (← links)
- A simulated annealing approach to mine production scheduling (Q5313397) (← links)