Pages that link to "Item:Q943786"
From MaRDI portal
The following pages link to On stochastic lot-sizing problems with random lead times (Q943786):
Displaying 21 items.
- Two-stage stochastic lot-sizing problem under cost uncertainty (Q383162) (← links)
- Stochastic lot-sizing with backlogging: computational complexity analysis (Q537961) (← links)
- Stochastic lot-sizing problem with deterministic demands and Wagner-Whitin costs (Q613341) (← links)
- Stochastic lot-sizing problem with inventory-bounds and constant order-capacities (Q613461) (← links)
- An \(O(N^2)\)-time algorithm for the stochastic uncapacitated lot-sizing problem with random lead times (Q631221) (← links)
- The stochastic lot-sizing problem with quantity discounts (Q1652181) (← links)
- Single-item dynamic lot-sizing problems: an updated survey (Q1694825) (← links)
- A polyhedral study of the static probabilistic lot-sizing problem (Q1708524) (← links)
- Dynamic programming and heuristic for stochastic uncapacitated lot-sizing problems with incremental quantity discount (Q1954948) (← links)
- Heuristic methods for the capacitated stochastic lot-sizing problem under the static-dynamic uncertainty strategy (Q2003567) (← links)
- Dynamic lot sizing with stochastic demand timing (Q2140333) (← links)
- Multi-echelon supply chains with lead times and uncertain demands. A lot-sizing formulation and solutions (Q2241314) (← links)
- A mixed integer programming formulation for the stochastic lot sizing problem with controllable processing times (Q2668748) (← links)
- Approximation algorithms for the stochastic lot-sizing problem with order lead times (Q2846418) (← links)
- The Dynamic Lot-Size Model with Stochastic Lead Times (Q3220308) (← links)
- Multistage Lot Sizing Problems via Randomized Rounding (Q3635024) (← links)
- Optimal Lot-Sizing/Vehicle-Dispatching Policies Under Stochastic Lead Times and Stepwise Fixed Costs (Q3635181) (← links)
- Note—A Note on the Dynamic Lot-Size Model with Uncertainty in Demand and Supply Processes (Q3823386) (← links)
- The Nonstationary Stochastic Lead-Time Inventory Problem: Near-Myopic Bounds, Heuristics, and Testing (Q4887778) (← links)
- New valid inequalities and formulations for the static joint chance-constrained lot-sizing problem (Q6038656) (← links)
- On a Multi-stage Stochastic Programming Model for Inventory Planning (Q6160361) (← links)