Pages that link to "Item:Q950037"
From MaRDI portal
The following pages link to Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project (Q950037):
Displaying 5 items.
- Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints (Q356114) (← links)
- Series queuing network scheduling approach to co-scheduling model of three Gorges-Gezhou dam (Q625670) (← links)
- Lockage scheduling of three gorges-gezhouba dams by hybrid of chaotic particle swarm optimization and heuristic-adjusted strategies (Q670765) (← links)
- Simulated annealing-based ant colony algorithm for tugboat scheduling optimization (Q1954570) (← links)
- Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA‐II (Q6090473) (← links)