Pages that link to "Item:Q958450"
From MaRDI portal
The following pages link to A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations (Q958450):
Displaying 13 items.
- Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications (Q1348546) (← links)
- On the complexity of coordinated display of multimedia objects (Q1575545) (← links)
- Permutation schedules for a two-machine flow shop with storage (Q1785731) (← links)
- Two-machine flow shop total tardiness scheduling problem with deteriorating jobs (Q1930748) (← links)
- On a borderline between the NP-hard and polynomial-time solvable cases of the flow shop with job-dependent storage requirements (Q2149603) (← links)
- On permutation schedules for two-machine flow shops with buffer constraints and constant processing times on one machine (Q2158014) (← links)
- Two-machine flow shops with an optimal permutation schedule under a storage constraint (Q2197318) (← links)
- A 5-parameter complexity classification of the two-stage flow shop scheduling problem with job dependent storage requirements (Q2230732) (← links)
- Flexible flow shop with dedicated buffers (Q2414462) (← links)
- Quantity-based buffer-constrained two-machine flowshop problem: active and passive prefetch models for multimedia applications (Q2434299) (← links)
- Efficient Lagrangian heuristics for the two-stage flow shop with job dependent buffer requirements (Q5915911) (← links)
- An exact borderline between the NP-hard and polynomial-time solvable cases of flow shop scheduling with job-dependent storage requirements (Q6497031) (← links)
- Algorithms for flow shop with job-dependent buffer requirements (Q6629020) (← links)