Pages that link to "Item:Q964872"
From MaRDI portal
The following pages link to Minimizing the total weighted completion time in the relocation problem (Q964872):
Displaying 13 items.
- Relocation scheduling subject to fixed processing sequences (Q282245) (← links)
- Tight complexity analysis of the relocation problem with arbitrary release dates (Q638514) (← links)
- On relocation problems with multiple identical working crews (Q865754) (← links)
- Approximation algorithms for inventory constrained scheduling on a single machine (Q906561) (← links)
- Generating the best \(K\) sequences in relocation problems (Q1309945) (← links)
- Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints (Q1610141) (← links)
- Resource-constrained flowshop scheduling with separate resource recycling operations (Q1762095) (← links)
- An FPTAS for two performance measures for the relocation scheduling problem subject to fixed processing sequences (Q2128769) (← links)
- Approximating the optimal sequence of acquisitions and sales with a capped budget (Q2348705) (← links)
- Quality of move-optimal schedules for minimizing total weighted completion time (Q2480059) (← links)
- A Fast Greedy Algorithm for the Relocation Problem (Q2807030) (← links)
- Some results of the relocation problems with processing times and deadlines (Q3979692) (← links)
- An FPTAS of minimizing total weighted completion time on single machine with position constraint (Q5136235) (← links)